Warnings Against Scaling Back HS2 Project

Warnings Against Scaling Back HS2 Project

Warnings Against Scaling Back HS2 Project : Cancelling the eastern extension of HS2 that connects to Leeds and Sheffield, would be “out of touch” with the expectations of Northern leaders, according to Transport for the North (TfN). Earlier this year, the government announced an independent review into whether and how the HS2 scheme should proceed, with a final report due later this year. Following speculation that the review into HS2 may consider stopping the eastern leg, TfN has warned against scaling back the project. A spokesperson said: “As indicated in the HS2 Phase 2b command paper, there is spare capacity on both the Western and Eastern legs of HS2 that could be used to deliver wider regional connectivity. It would therefore be a huge missed opportunity if the current ambition for HS2 and the benefits it could deliver for the North East of England are scaled back; and such a decision would be seen as out of touch with what northern leaders would expect as part of a truly 21st century pan-northern rail network. “In Transport for the North’s submission to the Oakervee Review we have asked that in any review of governance structures of HS2 that TfN is included on the HS2 Board so that the North has a direct say over future development and construction of the northern legs. This would better prevent decisions being taken that are not in the interests of the North of England. “Together, HS2 and Northern Powerhouse Rail will make significant direct contributions to the connectivity and capacity of the UK, and they will provide new high speed services across and from the North that better meet customer expectations, as well as support future economic growth for decades to come.” The proposed eastern leg of HS2 would connect Birmingham, Tonton in the East Midlands, Sheffield and Leeds. Manufacturing & Engineering Magazine | The Home of Manufacturing Industry News

Future Face of Engineering at HS2 Has Been Revealed

Future Face of Engineering at HS2 Revealed

Marking International Women in Engineering Day (INWED) on Sunday 23 June, HS2 Ltd has produced a short film which subverts the stereotype of what an engineer looks like, challenging the out-dated masculine preconceptions of an industry that is rapidly becoming more gender-inclusive. The short film stars Clara Lenzi, a Project Management apprentice at Britain’s new high speed railway and was filmed on location at the future location of HS2’s super-hub at Old Oak Common. Demolition of the former sheds at the one-kilometre long site in London is now well underway, ready for construction of what will be one of the best connected rail stations in the country. Currently, the number of female professional engineers in the UK is around 12 per cent, which is the lowest in Europe. However, 30,000 people will play a role in designing and delivering the new backbone to Britain’s railway, and HS2 is making steps to ensure that local people, under-represented and disadvantaged groups are among them, which in turn is helping to reduce gender disparities within the industry. Mark Lomas, Head of Equality, Diversity and Inclusion (EDI) at HS2 Ltd, said: “From procurement to training, inclusivity is at the heart of all that we do. Initiatives such as the establishment of a Gender Balance Network and a blind auditioning pilot have seen HS2 recognised this year as the number one gender-inclusive employer by Vercida for our approach to tackling these inequalities. “Elsewhere, our education programmes and curriculum-linked materials are helping showcase the benefits of a career in science, technology, engineering and maths – or STEM – to young people up and down the country.” As part of its drive to encourage more women to consider a career in the construction industry, HS2 Ltd has worked in partnership to deliver a six-week pilot employability programme in the West Midlands. Fifteen women signed up to the programme and two have already been offered full time positions within the construction industry ahead of their placements finishing next week. Clara Lenzi from London was keen to spearhead HS2’s INWED campaign as she attributes the new railway’s role in attracting more women into traditionally male-dominated sectors as a reason for joining the project. Gaining two years’ experience, in addition to a qualification, has helped the 21-year-old build her skills to progress in the industry, an advantage she feels she has on those coming straight from university. Clara Lenzi, HS2 Ltd Project Management apprentice said: “I am proud to be one of many apprentices working for HS2 who are women. “At HS2 I’ve been given lots of responsibility, which has aided my progression and success as a Project Manager and allowed me to build invaluable relationships within the workplace. I am learning from some of the most experienced people in the industry.” Clara is one over 320 apprentices who have supported HS2 since Royal Assent was granted in 2017 on Phase One of the railway between Birmingham and London. The most recent intake of apprentices working at HS2 Ltd was 43 per cent female.

HS2 Lauches Design Contests to Find Architects for Four New Stations

HS2 Lauches Design Contests to Find Architects for Four New Stations

It has been announced that High Speed 2 (HS2) is to run a series of competitions to find contractors for its new, landmark stations on the £43bn rail route. In an interesting take on usual procurement procedure, HS2 has asked for design proposals covering the planning stations at Birmingham Interchange, Curzon Street, Euston, Old Oak Common. Four leading architecture firms have already submitted first-phase plans for the stations which are due to be completed in 2026. Arup, Wilkinson Eyre, Grimshaw, and Weston Williamson have each designed with the contemporary, as well as the functional, in mind and outline plans provide exciting clues as to what the develop has in store. The contests will be the first HS2 commissions to be architect-led rather than motivated by civil or construction specification capabilities. Such an emphasis, in many ways, characterised the ambitions of HS2 in that it will not only be a practical mobility solution but is also expected to put the UK back on map in terms on modern public transportation. The nominated design firm’s plans will then be passed on to to the elected main contractor and partnered planning and civil consultants to full project realisation. It comes as no surprise then that Sadie Morgan, Chair of the HS2 design panel, urged contractors to partner with architect firms when bidding for new work on the project if they wanted a shot at the multibillion pound project. A spokesperson for HS2 maintained that contract agreements remain in the early stages, as yet, it is unknown whether both north and south stations will be arranged in the same way owing to varying requirements and aspirations. Confirmation is expected later this year. During the first phase, HS2 will connect London with Birmingham, readily speeding up journey times between the north and south. In the second phase work, the capital will be joined up to neighbouring cities, Manchester and Leeds. At completion, estimated for 2033, the high-speed rail project is hoped to increase national mobility, providing vital transport links needed by businesses and the modern passenger. Tendering for the phase two development partner and professional consultancy services will remains open until the end of the month. Let bidding commence. Manufacturing & Engineering Magazine | The Home of Manufacturing Industry News

Northern Powerhouse Dream Gets One Step Closer to Reality

Northern Powerhouse Dream Gets One Step Closer to Reality

Northern Powerhouse Dream Gets One Step Closer to Reality : In a digression from his usual party line on cutting down the national deficit, George Osborne has emerged to express his support for devolution plans which, if they go ahead, will give major Northerns cities greater control over housing, transport, planning and policing. In what is hoped to be the first stage of the “Northern Powerhouse” dream, the Chancellor of the Exchequer is set to back plans for a fast rail line between Leeds and Manchester in this week’s budget. It was back in October that the ‘Northern Powerhouse’ plan was initially signed off though last week’s comments were the first real sign of plans coming to fruition. Planned civil works have been drawn up by Transport for the North (TfN), the head of which, David Brown, said development was inevitable and necessary. The route between the two major cities is predicted to be at the top of Lord Adonis’ report for the National Infrastructure Commission. Commentators have suggested the report could well include recommendations of anything from full electrification to a whole new network. TfN has gone further, calling for a 30-mile tunnel to be built under the Pennines in order to link Sheffield and Manchester. The group has suggested the tunnel could slash journeys between the cities by some 30 minutes, as well as alleviating road congestion by providing a more convenient rail service. Five different outline plans have been submitted by the transport body and range from a door-to-door, city centre to centre city route, to one that winds around Manchester to the north-east of Sheffield. The investment has been calculated to represent a £56.6bn increase to size of the northern economy by 2040. It would also include a new fast track rail line, connecting the northern ends of High Speed 2 by 2033. A new 20-mile section linking Liverpool to HS2 would also be built while lines would be upgraded. The National Infrastructure Commission however is understood to be hesitant committing to what would be one of the longest underground routes in the world. The project is forecast to cost some £6bn. Adonis is understood to be concerned about the viability of other major projects such as London’s Crossrail 2 if the transport budget is spread elsewhere. Whether the north will ever receive the attention and joined-up treatment as the capital remains to be seen, but Osborne’s latest comments are surely a hopeful sign. Manufacturing & Engineering Magazine | The Home of Manufacturing Industry News