By adopting Aggreko’s all‑electric solution after damage to its electrical supply, a Scottish pharmaceutical and biotech company eliminated the need for approximately 250,000 litres of diesel per week, avoiding around 406,000 tonnes CO₂e in emissions at the same time. Ryan Forsyth, Manufacturing Sector Sales Representative from Aggreko, breaks down the engineering team’s decision-making process, from the initial incident to the solution that delivered significant sustainability benefits.
Effective engineering starts with understanding the problem
When something unexpected happens on a critical industrial site, there can be a temptation to jump straight to the solution. But good engineering starts one step earlier – by truly understanding exactly what has happened and what the customer needs to protect.
It was a sudden incident that damaged the electrical supply to the Scottish pharmaceutical and biotech company’s essential on-site compressors. Sudden and significant. The damage left a critical gap in the compressed air supply necessary for their production of medication, including the life-saving penicillin, so, every hour counted.
Our first engineering decision was clear-cut: the swift restoration of operations. However, the company’s strong commitment to sustainability meant any solution implemented also had to align with environmental objectives.
While a diesel-powered option was initially considered, our engineering team identified a better-suited alternative.
Pivotal questions
Our team began with two simple questions: What do you still have? And what do you need?
By leading with curiosity, our decisions could be based on detail and evidence, rather than quick assumptions or observations that could lead us to the wrong solution.
This curiosity proved pivotal, leading to the discovery that the site’s high-voltage (HV) power infrastructure remained intact and fully capable, despite the damage to the compressors’ direct electrical supply. Instead of replacing the lost capacity with diesel-powered equipment, our team recognised an opportunity to leverage the existing electrical infrastructure already available on site.
We presented an all-electric solution, leveraging the existing HV supply by installing a step-down transformer to deliver 415V power to electric compressed air units.
A solution for the sustainable age
We delivered the project as a full turnkey solution, with the objective to restore operations quickly without unnecessary complexity or over-engineering.
The engineers deployed eight 1600cfm electric compressors, one step-down transformer, and the associated infrastructure. This included working with on-site suppliers to provide track matting, fencing, and electric lighting for a secure compound.
Ultimately, this all-electric solution avoided the need for approximately 250,000 litres of diesel per week, which would have amounted to around 406,000 tonnes CO₂e in emissions each week.
Power in collaboration
We were told by the customer that our technical expertise, deep industry experience, and strong existing relationship with the on-site teams were key factors in our initial selection. Together, these factors played a role in how quickly and effectively the solution was deployed. The decision to place dedicated personnel on site each day also helped accelerate commissioning, ensuring the facility was operating on a 100% electric solution from the outset.
The customer understood that while it was vital to restore their electric supply as soon as possible, it was also an opportunity to put sustainability at the heart of this restoration. Which this project did, both simply and innovatively.
The result was significant emissions reductions and cost savings. And, perhaps most importantly, the deployment of these advanced solutions meant their critical production went on without interruption, averting a potential global shortage of essential medicines like penicillin.
This project is a testament to how collaborative engineering decision-making can transform an unexpected challenge into operational resilience and environmental benefits.